Below is a list of some of the amazing projects built by City Concrete Construction Inc in the past three(3) years:

 

HYATT HOTEL
20 Traders Blvd. Mississauga, ON

Year of construction: 2018
Construction Manager: Chamberlain Construction Services

Summary of Scope: Completed the construction of concrete foundations. Some of the work included are layout and bench markings; form, supply, and place concrete to all piers, footings, and foundation walls; waterproofing; placing and leveling of anchor bolts. Construction of Elevator and Stairwell shaft walls 8 floors high. Over 45,000 SQ FT of concrete slab work performed.

 

STEAM WHISTLE BREWERY
155 Bremner Blvd Toronto , ON

Year of construction: 2018
Construction Manager: Woodbecker Construction Managers

Summary of Scope: Completed the construction of concrete foundations. Some of the work included are layout and bench markings; form, supply, and place concrete to all piers, footings, and foundation walls; 32,000 SqFt Commercial flatwork and Mezz. slabs.

 

RIPLEY’S AQUARIUM OF CANADA
288 Bremner Blvd, Toronto, ON

Year of construction: 2018

Summary of Scope: Completed Architecture coloured concrete flatwork banding throughout the entire property.

 

THE PICKLE BARREL
1355 Kingston Road, Pickering, ON

Year of construction: 2018
Construction Manager: B.L.T. Construction Services

Summary of Scope: Completed the construction of new footings, foundation walls, and piers including the installation of reinforcements bars and rigid insulation. Also completed additional scope of patio slab on grade using colored concrete as well as concrete steps and sidewalk.

 

THE CHEESECAKE FACTORY, Phase I & Phase II
Yorkdale Mall, Toronto, ON

Year of construction: 2017 - 2018
Construction Manager: Anjinnov Construction

Phase 1: Construction of footings and foundation walls. Some of the work included are excavation and disposal of native soil and completion of slab on grade, suspended slab and concrete topping. Also completed additional scope like additional excavation of sump pit and use of high early concrete to reduce curing time, concrete cutting to create bearing for new slab.

Phase 2: Completed the underpinning to existing grade beam and frost wall for Patio. That includes excavation and disposal of native fill to give way to the concrete. Also completed the construction of concrete curbs and slab on grade including the supply and installation of rigid insulation along exterior perimeter wall and grade beam.

 

MARRIOTT RESIDENCE INN
35 Courtney Park Drive, Mississauga, ON

Year of construction: 2017
Construction Manager: Chamberlain Construction Services

Summary of Scope: Completed the construction of concrete foundations. Some of the work included are layout and bench markings; form, supply, and place concrete to all piers, footings, and foundation walls; waterproofing; placing and levelling of anchor bolts.

 

CN Rail
8820 Keele St Vaughan, ON

Year of construction: 2017
Construction Manager: Kinley Construction

Summary of Scope: Construction of a multi-million-dollar concrete fuel tank containment comprised of foundation walls and footings, structural rebar, heavily reinforced slab with chemical water stops, sump pits, and structural caissons for fuel pipe lines. Placement of structural concrete in and about roadways and railways. Installation of culvert to manage and contain any spills to a containment pond.

 

COMFORT INN AND SUITES
5 Spicer Square, Bowmanville, ON

Year of construction: 2017
Construction Manager: Reids Heritage Construction

Summary of Scope: Construction of footings, foundation walls and concrete slab on grade.

 

PRIMROSE HOTEL
111 Carlton St., Toronto, ON

Year of construction: 2017
Construction Manager: Woodbecker Construction Managers

Summary of Scope: Reconstruction of the entire front entrance, architectural concrete ramps, steps and roadway. Concrete restoration by means of mechanical grinding, parging and sealing of columns to enhance the structural integrity, while maintaining a desired architectural appearance.  Installation of interlocking paving stone for both driveway approaches and pedestrian walkways in various shapes and patterns.

 

YVES SAINT LAUREL
Yorkdale Mall, Toronto, ON

Year of construction: 2017
Construction Manager: Construction Company

Summary of Scope: Concrete saw cutting and scanning, shoring and excavation 9ft 6” below grade within the mall to fabricate four new structural foundation footings to bear the new store front’s glass façade.

 

DISTILLERY DISTRICT
12 Trinity Street, Toronto, ON

Year of construction: 2017
Construction Manager: Woodbecker Construction

Summary of Scope: Excavation of the historic catacombs and dewatered below Lake Ontario for the construction of an alcohol fire ejection containment walls and slab.  Constructed and restored slabs and ramps to match the historic concrete hues and aesthetics. Construction of the exterior Cooling tower foundation walls, while preserving the historic cobble stone paving.

 

CENTRAL TECHNICAL SCHOOL
725 Bathurst St., Toronto, ON

Year of construction: 2016
Construction Manager: KCL Contracting & Engineering LTD.

Summary of Scope: Construction of Architectural concrete finished – seat walls, curbs, foundation walls, custom pillars and caps.  Fabrication and tying of all structural rebar’s, and Architecturally finishing of all reinforced walls and slabs.

 

MARS DISCOVERY DISTRICT
101 College St., Toronto, ON

Year of construction: 2016
Construction Manager: Urban Outline Building Group Ltd.

Summary of Scope: Demolish and replace existing exterior coloured concrete paving, roadway curbs and steps.  Reinstating new soft and hard landscaping. Salvage and restoration to a historically protected site for exterior granite paver walkways, granite steps and historic brick restoration.  Installation of new foundation walls, slabs, and trench drains.  Reinstating of all hard landscaping.

 
favicon.png

CHEMTURA
30 Chemical Court, Markham, ON

Year of construction: 2016
Construction Manager: Praxair

Summary of Scope: Construction of structural flatwork and placement of concrete in confined areas. Placement of concrete to contain chemical emergency spills. Deep excavation and shoring to facilitate repairs 12 ft. deep for broken main fire hydrant line.

 

 

Ready to take the next step?